Family-owned in Englewood since 1957. Open 24/7.

Commercial construction plumbing for the Denver metro

From multi-family and hotels to medical centers and museums, we install the plumbing and mechanical systems that keep a building running, built to code and on the general contractor's schedule.

Send us your plans

Share drawings and specs, and we will price the plumbing and mechanical scope.

Built by a contractor that grew with Denver

Since 1957, Befort has been part of the Denver metro's growth, from multi-family and hospitality to medical centers and public buildings. Four generations in, our construction division brings what general contractors and developers count on: code knowledge, clean coordination, and systems built to last.

We do not just install pipe. We build the systems that keep a building running, and our service team can support them long after turnover.

Project types

Construction scope we deliver

Underground rough-in

Sanitary and storm-water rough-ins, sewer main connections, and water service lines.

DWV and storm systems

Drain, waste, and vent networks, with acoustic dampening where noise matters.

Domestic water and booster systems

Pressure-boosted and pressure-regulated water distribution for multi-story buildings.

Medical Gas

Fully licensed to install and repair critical medical piping infrastructure. 

Senior living and accessibility

Master mixing valves for anti-scald protection, ADA-compliant fixtures, and walk-in bathing.

Design-build

Early pre-construction involvement to find value-engineering savings.

Previous and current projects

A sample of the buildings our construction crews have plumbed across the metro.

Denver Dry Preservation

Historic remodel, downtown Denver

Top-to-bottom plumbing modernization: new main water service, a redesigned sewer and waste system, new distribution lines, and new fixtures in every unit.

Montview Flats

Multi-family new construction

Turnkey plumbing from underground rough-ins to unit fixtures, with a pressure-boosted domestic water system and a central high-recovery hot water plant.

Hampton Inn

Hotel new construction

A central hot water system with redundant boiler arrays, pressure-regulated distribution, and acoustic dampening on DWV piping to keep guest rooms quiet.

Renaissance Hotel lobby bar

Hospitality remodel

A complete plumbing overhaul of the bar in a working hotel, re-routing utilities and adding new sanitary and water lines for high-volume service.

Water World expansion

Federal Heights

Ground-up plumbing for a three-building expansion: main water distribution, high-volume drainage, food and beverage facilities, and cabanas.

WWII Victory Museum

Centennial Airport

Ground-up plumbing with multi-zone commercial hot water and secondary leak containment to protect aircraft and collections on display.

Project spotlights

Image Studios
South Metro Fire Station 23
VPP Alameda remodel

How the job works

We build to the general contractor's schedule and keep the trades around us moving.

Pre-construction

We review plans, flag value-engineering opportunities, and price the scope.

Schedule and coordinate

Rough-ins are planned around the critical path, using BIM and prefabrication where they help.

Install and test

Every joint and fixture gets air and water pressure testing before walls close.

Inspect and turn over

Systems pass inspection and are ready for substantial completion.

Our zero-compromise safety standard

Safety on our job sites is led by David Hayutin, Director of Health and Safety.

Have a project out to bid?

Send us plans or call to talk through scope and schedule.

Building across the Denver metro

From downtown Denver to Federal Heights and Centennial Airport, our construction crews work across the metro from our base in Englewood, and our commercial service team supports buildings after they open.

Where we work

Befort Plumbing & Heating

3980 S Kalamath St, Englewood, CO 80110

303-366-2433, open 24/7

Get directions

Questions we hear a lot

We work within International Building Code and International Plumbing Code requirements on large builds like Montview Flats and the Hampton Inn. Every installation, from central hot water plants to DWV networks, is built to meet franchise standards and pass municipal inspection.

We plan around the critical path. BIM and prefabrication help us finish rough-ins ahead of framing and drywall, and we stay in close contact with the general contractor to hit dry-in and substantial completion dates.

Yes. We can join early in pre-construction to find value-engineering opportunities, such as better riser locations or high-efficiency boiler arrays, that lower project cost without sacrificing performance.

Every joint and fixture goes through multi-stage air and water pressure testing before walls close. We use high-grade materials and acoustic dampening on waste lines for durable, quiet systems in multi-family and hotel buildings.

Safety and accessibility come first: master mixing valves for anti-scald protection, ADA-compliant fixtures, and walk-in bathing systems, all designed so facility staff can maintain them with minimal disruption to residents.

Request service

Tell us what is going on and where. We will call you back to confirm the details and set a time.

  1. Send the form. A few details help us bring the right parts.
  2. We call you back to confirm and schedule.
  3. You get a price before work starts. No pressure, no hidden fees.

Prefer to talk? Call 303-366-2433. We are open 24/7.

This field is for validation purposes and should be left unchanged.